21Feb/10
I started my new teaching gig at wyotech a couple weeks ago....so it's been pretty hectic with the new full time job and getting work done at the shop. Alot of small jobs have been getting done, but I neglected to get any pics.

The s2k disaster is now almost completely redone.....There are a couple of little details left.

I've been meaning to get some more fabrication pictures....so here are -10 crankcase breather vents welded on the s2k valve cover

Intercooler piping we fabbed up...with Tial 50mm bov and water/meth injection bung welded on.

Hot side I/C pipe we built...very tight fit between the subframe and the rack

Lower cold side I/C pipe

We cleaned up the all the hack work previously performed to the s2k....properly remounted the accessories on the frame rail using nutserts.

Battery bracket/tray

old school Celica with s2k motor in for tuning

clean

vroom....TWM 52mm ITB's

Yeah....this will be my next project

Silver Elise is finally getting the finishing touches...APR front splitter

solid

We made custom spacers to provide proper fitment in the raised area in the middle of the clam


We also installed an APR carbon rear wing

rear shot

All the engine and mechanical work finished...ready for the dyno

During all the work we've had we have also been putting in some work on the cage for our shop car


parachute support

20Feb/10
Sorry I'vebeen lagging on posting new content....I will getsome new material up this weekend.
2Feb/10

The complete hack job s2k getting redone....alot more has been done since the pic....I will get some more images

New MWR built motor getting installed in the Exige

Reverie dry carbon lip installed on the Exige


Reverie dry carbon wing installed

Reverie carbon sill extensions and side ducts fitted

looking mean.......
1Feb/10
I have been really busy with shop and new job...I have some pics and I will get an update this week.